Projects

 

OUR PRIMARY PROJECT EXPERIENCES

With a solid background from the almost 10 years at DNV Esbjerg, and since our company establishment with commencement of Independent Consultant Services in December 1995, we have achieved very large and versatile experience by participating in Offshore and Onshore Oil & Gas and Energy Projects of very different nature and scope.

Project Experience from the Oil & Gas and Energy Industries since 1986

Primary Project Experiences:

 

Mar. 2018 – Present - Ce-Tec A/S

Project Manager at Total Oil & Energy – Tyra & Gorm Asset Minor Modifications.

 

Aug. 2017 – Mar. 2018 - Ce-Tec A/S

Project Manager at Maersk Oil & Gas AS – Tyra & Gorm Asset Minor Modifications.

Dec. 2016 – Aug. 2017 - Ce-Tec A/S

Consultancy agreement with Ce-Tec A/S on ad hoc service for the Offshore Industry.

May 2016 – Oct. 2016 - SEMCO Maritime A/S

Senior Construction Coordinator on the Hejre Stand Alone Project. Project main activities – design & installation of: Ampelman Access Facilities, 24 VDC & 240 VAC Solar Cell Power Systems, Wind Turbine, Life Rafts and Davits, Life Saving Equipment, Hook-up & Commissioning and minor modification of existing equipment.

 

Aug. 2015 – Mar. 2016 - SEMCO Maritime A/S

Senior Construction Coordinator on HUC of well NB5 on Nini East & related MG/NE and the later MG/SIRI Rig Interface Projects

 

June 2014 – June 2015 - Rambøll Denmark A/S

Senior Discipline, Construction & Installation Lead for HESS Denmark – Project Team, with primary focus on within­­­­­­­ piping, pro­cess & mech­anical systems and supporting structures, including commenting estimating and planning of offshore projects.

 

Jan. 2011 – June 2014 - Hess Denmark Aps

Onshore & Offshore Discipline Engineer during design, fabrication & installation phases of the South Arne “Phase 3 Project” including modifications and installation of tie-is for, and later installation and hook-up & commissioning of 2 new production platforms.

 

Jan. 2008 – Jul. 2008 - Lodahl Aps

Lodahl Aps. - Consultant for DONG Energy A/S in final design phases of the “CHC Project”, Statoil Mongstad Norway. Review and comment on PID and ISO drawings. QA Audit and inspection during fabrication of piping packages at Amigos Ltd. Vung Tau, Vietnam.

Apr. 2005 – Jan. 2011 - Ce-Tec A/S

Offshore Eiscipline Engineer in design and installation phases of “Tyra East Subsidence” project dealing with strengthening of main load bearing structures on bridges, wellhead platforms, riser platform and the main platform (TEA, B, C & E). Reinforcements were made by welding of diagonal braces in platform facades from elevation 6 meters to 22 meters above water. And plate reinforcements were welded in deck elevation 22 meters (“Cellar Deck”) on all 4 platforms.

 

Apr. 2005 – Jan. 2011 - Ce-Tec A/S

Offshore Discipline Engineer during “Tyra East Flowline Upgrade” project dealing with replacement of all original production manifolds, flowlines and headers from wells on WH platforms to separators on the main platform. Original piping was modified and changed from conventional carbon steel to super duplex materials.

 

Jan. 2001 – Apr. 2000 - Ce-Tec A/S

Offshore Discipline Eengineer in design and installation phases on “Tyra West Subsidence” project dealing with strengthening of the main load bearing structures on bridges, wellhead platforms and the main platform (TWA, B & C). Reinforcements were made by welding diagonal braces or crosses into the platform facades between elevation 6 meters to 22 meters above water. In addition, original diagonal U-profile stiffeners of the deck elevation 22 meters (“Cellar Deck”) were replaced with larger RHS profiles on all 3 platforms. On the main platform, the project was expanded to include reinforcement of existing- and installation of additional columns for bracing between large cantilevered deck sections elevation 22 meters and decks above in elevation 31meters.

 

Oct. 2002 – Aug. 2004 - Ce-Tec A/S

Offshore discipline engineer through design, installation and hook-up & commissioning phases of the Tyra West - “Halfdan Process Module & Nogat Pipeline” - projects.

 

Mar. 2002 – Apr. 2005 - Ce-Tec A/S

Offshore Discipline Engineer during “Tyra West Flowline Upgrade” project dealing with the replacement of all original production manifolds, flowlines & headers from wells on wellhead platforms to separators on the main platform. Original piping design was modified and changed from conventional carbon steel to super duplex materials.

 

Jan. 1999 – Oct. 2000 - Ce-Tec A/S

Offshore Discipline Engineer during the “Tyra West LP Compression” project dealing with replacement of compressor and rebuilding of the compressor module including installation of deck extension with slug catcher, installation of suction scrubber, gas coolers and new piping.

 

Dec. 1995 – 1997 - Ce-Tec A/S

Offshore Discipline Engineer during installation and hook-up & commissioning phases of the “Tyra West Bridge Module Project”.

 

1995 – Dec. 1995 - DNV

Assistant Project Manager for the “inservice” contract between Mærsk Olie og Gas AS and DNV. Assistant project manager and project coordinator during the “Dan Field 1995 Development Project” design phases.

 

1993 - 1995 - DNV

Veritas Project Coordination during “Skjold 1992 Devel­opment Project” design, fabrication and HUC phases. Project coordination of “Valdemar Development Project”, project activity design of "Valdemar Tie-in to Tyra". Project coordination during Gorm project "Upgrade Dan & Tyra Inlets".

 

1992 - 1993 - DNV

Veritas Representative during hook-up and commissioning of the “Dan F/Dan E Water Injection Project”, “Dan FB New Wells Project” and “Dan F Booster Compressor “ projects.

 

1991 - 1992 - DNV

Veritas Representative during hook-up and commissioning of “Dan F Compressor Upgrade Project”, “Kraka Tie-ins Project”, “Dan FA New Wells Project” and “Gorm F Development Project”.

 

Aug/Sep. 1990 - DNV

Veritas­ Representative during installation of Dagmar field star platform jacket and topside module. The installation performed by jack-up drilling rig.

 

1988 - 1990 - DNV

Veritas representative during hook-up, commissioning and comple­tion of “Gorm Water Injection”, “Skjold Further Development” and “Dan F A&B Horizontal Wells” projects.

 

1987 - 1988 - DNV

Veritas Representative during installation and HUC phases of “Tyra East Stock Tank Compressor ” and “Tyra West Increa­sed Conden­sate” projects.

 

1986 - 1987 - DNV

Veritas Representative during hook-up, commissioning and completion of the “Tyra West Conden­sate Project”. Veritas representative during “Dan Field Modification” and “Dan extension II” projects.

 

Feb. 1986 – Dec. 1995 - DNV

Project Coordination – Verification and issuance of approval letters and “release notes” in the design & fabrication onshore and installation and hook-up & commissioning phases at DUC development and in-service pro­jects. Veritas representative onshore and offshore on DUC fixed offshore installations during Annual Surveys of Topside Facilities - ASTF. Design and Type Approval of tank containers in accordance with the IMDG, ADR and RID regulations. (For the transport of dangerous goods).